欧美日韩永久久一区二区三区-欧美日韩有码-欧美日韩在大午夜爽爽影院-欧美日韩在线播放-欧美日韩在线播放一区二区三区-欧美日韩在线播一区二区三区

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 午夜影视在线观看免费完整高清大全 | 日韩一级免费视频 | 日本高清免费视频aa | 国产日产亚洲精品 | 久久草在线视频 | 一二三区免费视频 | 久艹精品| 性猛交xxxx乱大交孕妇 | 国产99久久亚洲综合精品 | 伊人伊成久久人综合网777 | 精品一本久久中文字幕 | 日韩影视在线 | 一级肉体毛片视频免费看看 | 人人玩人人弄 | 一区二区视频 | 国产精品天天看大片特色视频 | 精品伊人久久久久网站 | 久久久999国产精品 久久久999久久久精品 | 国产成人3p视频免费观看 | 亚洲综合一区二区精品久久 | 国内精品伊人久久久久 | 久久国产精品亚洲77777 | 九九视频免费精品视频免费 | 久久精品视频在线观看榴莲视频 | 视频一区二区国产无限在线观看 | 精品亚洲欧美中文字幕在线看 | 欧美成人午夜不卡在线视频 | 91视频国产精品 | 亚洲韩国欧美一区二区三区 | 日本在线免费观看视频 | 一区二区三区在线 | 日本 | 中文 日本 免费 高清 | 中文有码第一页 | 香蕉福利久久福利久久香蕉 | 在线看不卡 | 爱爱成人免费视频mv | 国产在线啪 | 亚欧美综合 | 欧美视频在线观看网站 | 婷婷色在线观看 | 欧美一级毛片欧美大尺度一级毛片 |