欧美日韩永久久一区二区三区-欧美日韩有码-欧美日韩在大午夜爽爽影院-欧美日韩在线播放-欧美日韩在线播放一区二区三区-欧美日韩在线播一区二区三区

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 国产亚洲欧美日韩综合综合二区 | 99久热国产精品视频尤物不卡 | 妖精视频国产精品 | 免费看a| 亚洲欧美日韩中文字幕在线 | 精品久久综合日本久久综合网 | 91在线操 | 日本免费一区二区视频 | 欧美成人亚洲欧美成人 | 在线看日韩 | 黄色a三级免费看 | 三级国产三级在线 | 欧美亚洲国产成人不卡 | 91短视频版在线观看www免费 | 天天爽夜夜爽 | 亚洲日本在线看片 | 欧美色啪| 四虎影院免费在线播放 | 新版天堂中文资源官网 | 大香伊人网| 日本边吃奶边做爽视频 | 亚洲欧美视频网站 | 真实一级一级一片免费视频 | 久久国产片 | 亚欧精品一区二区三区四区 | 国产精品视频免费在线观看 | 最近日本免费观看mv免费版 | 欧美在线一区二区三区不卡 | 精品一久久香蕉国产线看观看下 | 4480yy私人影院高清不卡 | 久久人人干 | 天天干妹子 | 国产高清网址 | 欧美19综合中文字幕 | 九九99久久 | 亚洲欧洲日韩国产aa色大片 | 日韩欧美视频一区二区 | 羞羞视频免费网站欧美 | 久久久久久国产精品免费 | 人人看人人爽久久 | jizz中国女人 |