欧美日韩永久久一区二区三区-欧美日韩有码-欧美日韩在大午夜爽爽影院-欧美日韩在线播放-欧美日韩在线播放一区二区三区-欧美日韩在线播一区二区三区

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 国产免费久久精品99久久 | 中文字幕日本一级高清片 | 99久久这里只精品麻豆 | 亚洲国产三级在线观看 | 91久久综合九色综合欧美98 | 国产日韩一区二区三区在线播放 | www成人在线观看 | 五月天婷婷基地 | 成 人免费va视频 | 四虎影院永久免费 | 亚洲欧美不卡 | 日本亚洲黄色 | 国产精品艺校美女校花在线 | 欧美性猛交xxxx黑人喷水 | 91国内视频 | 亚洲视频三区 | 天天毛片 | 日韩欧美精品综合久久 | 久久久久久毛片免费播放 | 一级作爱视频免费观看 | 天天看天天摸色天天综合网 | 天天看天天摸天天操 | 在线看片日韩 | 日韩欧美在线综合 | 日本欧美视频在线观看 | 国产精品资源在线观看 | 中文在线免费看视频 | 日本a级毛片视频播放 | 午夜精品久久久久久久99热浪潮 | 亚洲精品中文一区不卡 | www.4虎影院| 国产精品香蕉夜间视频免费播放 | 国产成人啪精品视频免费软件 | 国产成人综合精品一区 | 国产成人丝袜美女厕所视频 | 一级片爱爱 | 日本强日本不卡一 | 亚洲精品一区亚洲精品 | 极品五月天| 久草网视频在线观看 | 国产成人永久在线播放 |